Home >  Products  >  ZhiCheng Series >  Back

WJBS-507 Thermal Insulation Inorganic Mineral Exterior wall paint

· It conforms to the standards of solar reflection ratio and near-infrared reflection ratio of JG/T235-2014 "Reflective Heat Insulation Coating for Buildings", and has the function of strong heat insulation

Contact Us

WJBS-507 Thermal Insulation Inorganic Mineral Exterior wall paint

Product Description

WJBS-507 Thermal Insulation Inorganic Mineral Exterior wall paint


WJBS-507 Thermal insulation inorganic mineral exterior wall coating conforms to the solar reflection ratio and near infrared reflection ratio standards of JG/T235-2014 "Reflective Thermal Insulation Coating for Buildings", with strong thermal insulation function. By grinding the active ingredients in the product into nano level, so as to reflect the thermal light, sunlight gathered in the building body heat quickly lost, so that indoor air more fresh, is suitable for high-rise residential, villa, office, museum, library, gymnasium and other inorganic coating.


Product characteristics


· Strong heat insulation: The effective components in the heat insulation materials are ground into nanoscale reflected light energy by scientific and technological means, which is equivalent to 10,000 small mirrors per square centimeter surface, rapidly dissipating the heat accumulated on the surface of the building due to the solar radiation.


· Construction standards: in accordance with the standards of sunlight reflection ratio and near infrared reflection ratio of JG/T235-2014 "Reflection Heat Insulation Coating for Buildings".


· Excellent performance: Grade A non-combustible material, environmental protection and health, zero grade mold resistance, good permeability and air permeability, durable anti-aging, paint color is not easy to fade.


· Convenient construction: Without special construction requirements, construction can be carried out directly on the wall to reduce construction time and cost


Construction procedure


Construction method: brush coating, roll coating, airless spraying


Theoretical coating amount: 8-12 square meters /kg (single times) due to the actual construction surface roughness and dilution ratio of different, the amount of paint consumption is also different


Dilution: before use should be stirred evenly, in order to achieve the best brushing effect, roller coating, brush coating can usually be added to the paint 10%-15% volume of water according to the actual situation, at most 15% volume of water dilution this product. After mixing well, let it stand for 5 minutes before construction. If airless spraying is used, water dilution of no more than 5% of the volume of the paint can be used according to the actual situation, and stir evenly


Construction conditions: temperature > 5℃, humidity < 85%


Storage: Store in a cool, clean and dry place at 5-35℃. The remaining paint should be sealed and covered to prevent impurities from deteriorating paint. If the product is not opened and properly stored, the storage period is 12 months.


Tool cleaning: After stopping during painting and finishing painting, please clean all tools with clean water in time.


Recoating time: (30 micron dry film, 25-30℃) about 1 hour /25℃; Recoating interval ≥3 hours /25℃.


Repaint the wall surface: Build a new wall surface, remove the surface dust, greasy and loose plaster, if there are pores in time to repair, to ensure that the wall clean, dry and smooth;


Substrate surface state: remove the old wall is not strong paint film, remove the surface dust powder material and impurities, batch smooth and no loose material


Coating system: Ensure that the surface humidity of the pre-coated substrate is less than 10%, pH value is less than 10 before coating, the substrate layer should be accepted, qualified before coating construction coating system and coating times, in order to ensure the best paint film effect, strongly recommend the use of primer


Welcome to the official account
Welcome to the official account